Milestone 1.0 Stable Release

Almanac (JS)

11 / 23

Design

2 / 3

Grok

10 / 13

general

5 / 9

templates (client)

2 / 4

The Stable Release will include all bugfixes and address all issues generated by the Feature Release.

Requirements

  1. All issues generated since the Feature Release that relate to the requirements of that release will be fixed (or otherwise closed if agreed upon by Orton and TOPP).
  2. Automated unit and acceptance tests where appropriate will be developed to ensure stability of the code base.
  3. Manual user tests will be conducted to demonstrate the usability of the almanac.
  4. Documentation will be produced to guide new users through contributing to the almanac. Additional documentation will be produced to describe the almanator role.
  5. Production server (or servers) will be set up for hosting the almanac.